Get a Quote
Mineral Exploration & Core Coring

Mineral Exploration & Core Coring

Recover high-quality core from deep hard-rock holes with a matched full-hydraulic rig, wireline system and consumables — engineered for steady recovery and high daily footage.

Conditions

What the job requires

Every application is defined by depth, formation and the equipment matched to those numbers — the configuration below is built around those numbers.

Headline rating1,200 m
Core / hole sizesBQ / NQ / HQ / PQ
FormationWeathered to hard rock
Recovery target95%+ core recovery
Recommended configuration

A complete, matched package

JQ-1200

JQ-1200

Full-hydraulic top-drive core drilling rig for deep hard-rock coring

View rig details

Matched tools and equipment

  • JQ-1200 main unitMax depth (NQ)
  • BW-250 fluid pump250 L/min
  • Drill rods & casingMatched full-depth set
  • Diamond & PDC bitsHard-rock matrix
  • Reaming shellsMatched to rods
  • Core / wireline barrelBQ–PQ assembly
  • Spare-parts packageWear and service parts
Configure and quote
Workflow

From setup to recovery

1
Site setupLevel the rig, connect the pump and power unit.
2
Open the holeCollar the hole with a guide and stabilize the top.
3
DrillingAdvance the bit, control pressure and rotation.
4
RecoveryRun the barrel, extract and log the core or sample.
5
Hole protectionCase unstable zones and keep fluid circulation.
Related cases

Results from real projects

Deep-hole core drilling at a metal mineGansu, China

Deep-hole core drilling at a metal mine

A JQ-1200 with NTW/HTW wireline tools cored a hard quartz-sandstone formation to 760 m at a 70° angle, completing three deep holes in 91 days.

760 mHole depth
≥95%Core recovery
3 holes91 days
Agricultural irrigation well groupNorth China Plain

Agricultural irrigation well group

A hydraulic exploration rig built a well group through loose Quaternary and sand layers, with wall-protection mud solving water-yield and stability needs.

260 mHole depth
100%Well success
~12 daysPer well
Geotechnical survey for rail transitUrban rail project

Geotechnical survey for rail transit

A light hydraulic rig with continuous core-barrel sampling handled many holes and frequent relocations along a long rail corridor.

120 mHole depth
35 m/dDaily footage
100%Report pass
Foundation survey and groutingBuilding project

Foundation survey and grouting

A core rig and crawler carrier worked together on pile survey and ground grouting, with the carrier handling frequent on-site moves.

80 mHole depth
On timeDelivery
CarrierSite moves
Teaching and research drillingUniversity campus

Teaching and research drilling

A light exploration rig gave geology students a clear, safe, easy-to-learn platform while meeting research sampling needs.

70 mHole depth
Full demoTeaching
CompleteTeaching core
Knowledge

Read before you specify

CallWhatsAppQuote