Case study
Foundation survey and grouting
A core rig and crawler carrier worked together on pile survey and ground grouting, with the carrier handling frequent on-site moves.
Get a free quoteProject background
The early stage of a building project involved pile survey and ground grouting. With frequent on-site moves, the main rig and the transport equipment had to work as a coordinated set.
Project details
| Equipment | Core rig + crawler carrier |
| Hole depth | 80 m |
| Scope | Survey coring + grouting reinforcement |
| Formation | Silty clay |
| On-site transport | Crawler carrier moves around the site |
| Delivery | Completed on schedule |
The crawler carrier moved equipment even on muddy ground, and the complete package saved a lot of crane hire costs.
Related equipment


Custom LDJ platform (4 t / 7-wheel)
Custom 4-ton hydraulic crawler platform, seven wheels
View detailsNeed a similar setup?
Tell us about your project and we will match the right rig, tools and turnkey package.
Get a free quote