Agricultural irrigation well group
Case study

Agricultural irrigation well group

  • North China Plain
  • Water wells
  • 2024

A hydraulic exploration rig built a well group through loose Quaternary and sand layers, with wall-protection mud solving water-yield and stability needs.

Get a free quote

Project background

A well group was built to supply irrigation water for farmland. The wells had to be completed through Quaternary loose and sand layers, with the focus on wall stability and water yield.

Project details

EquipmentHydraulic exploration rig (water-well setup) + wall-protection mud
Hole depth260 m
Well constructionCasing + gravel pack + well development
FormationLoose and sand layers
Well success rate100%
Time per wellAbout 12 days

The mud kept the wall stable and water yield stayed steady after completion. The after-sales team also gave professional advice on matching the pump.